Chapter 2181 - 2003: All That’s Left Is to Get to Work
Chapter 2181: Chapter 2003: All That’s Left Is to Get to Work
Not difficult to understand.
The taller.
The more people can be crammed in, the more area can be sold. You must know, the land in Roy City, if you calculate it, is almost like it’s free.
In the surroundings.
There aren’t many people to begin with, and even if there were, spread out over the entire project, it’s almost negligible. In such a case, of course, the taller, the better.
"Is it very tall?" Mi Hao asked again.
"No."
The person opposite shook their head.
"The Indian side wanted to, but Myanmar Bank Group vetoed it. In fact, most of the buildings increased in height by less than twenty percent and are still low."
"However."
"It formed another kind of compromise, which is making significant concessions in some areas, like adding some large, densely populated neighborhoods that can really pack people in."
"Thus."
"It somewhat meets both sides’ requirements."
After listening.
Mi Hao nodded.
Indeed.
For projects done by Myanmar Bank Group, the requirements have always been high, and their principles are strong. They would rather not do it than produce something undesirable.
One wants it to look good.
One wants to sell more.
Fine.
Then plan some large neighborhoods for you, other places retain the original standards, in this way, it won’t damage the overall aesthetic of Roy City too much.
Moreover.
With Myanmar Bank Group’s ’high standard aesthetics,’ even these high-rise buildings should be complemented with excellent design to make up for their shortcomings.
Yeah.
Good.
The rest is just to work.
Following this kind of Party A, or rather the representative of Party A, Mi Hao felt extremely satisfied at heart, just afraid that Party A would drag things out.
They also love to change things three times a day.
Unlike now.
It’s been just over half a month.
-Financing.
-Planning.
-Design.
-Drawing.
-Bidding.
It’s all completed, faster than lightning, and not even actively seeking financiers, just sitting at home with doors open, and money comes in.
Absolutely.
How many developers must be crying in the restroom, envious enough to want to bang their heads against the wall.
"By the way."
"How long until construction can start."
"June 1st."
"Huh?"
"June 1st."
Mi Hao: "..."
June 1st.
What day is it today? May 25th, which means there’s only six days, six days to pass the audit by the relevant construction departments of India.
Obtain various permits.
Boss.
Are you joking?
Back then.
Even for India’s city loan, the preparation time was not short, and when they entered the site for construction, more than half a month had passed since the bidding.
Now.
The amount of work has multiplied many times, yet the time is shorter.
At the moment.
The person opposite said:
"Hehe, don’t be surprised, this time there’s lots of capital involved. So much that they’ve combined forces, capable of doing many things, nothing to be surprised about."
"Indeed."
Mi Hao nodded.
After chatting for a while, he hung up the phone.
Now.
There’s no need to go to Africa.
Good.
And with such a large project, the bonuses are considerable. Just the bonuses from the previous project exceeded his annual salary, and more.
This time.
The contract has almost quintupled.
Once completed.
As the project manager, he could get at least over a million in bonuses.
Lovely.
...
The next day.
Headquarters sent over the blueprints.
"..."
Typically, a building has at least a dozen blueprints, from architectural planning to the finest materials list, blueprints for a neighborhood are tons-heavy.
And right in front of him.
Sixteen neighborhoods.
Alright.
It nearly filled the archive room. Just looking at it makes one dizzy. Mi Hao’s mouth twitched, he really had some doubts, is this something a human can do?
How long has it been?
These are sixteen neighborhoods, the entire Roy City is very large, no need to say, just the blueprints require over a dozen box trucks to transport.
Such a design task, under time constraints, is of hellish difficulty. However, who designs it, and how it’s designed, is not important now.
What matters is---to build.
"Phew!"
Taking a deep breath, picked up a general plan.
Meeting.
"We can see, this project is distributed in the east, south, west, and north in four directions, some are connected, so there are a total of six connected areas."
"Each area, one project department."
"This time."
"Due to the massive scale of the project, the company will send three additional deputy managers. According to the plan, construction starts on June 1st, related support facilities will arrive in the next few days."
"..."
No matter how good he is.
He can’t manage so many areas.
Therefore.
He is given two additional subordinates because, after all, each neighborhood has hundreds of buildings, with blueprints like little mountains, too far to keep running back and forth.
"In the next few days."
"Everyone should familiarize yourselves with the blueprints and formulate construction plans, once construction starts, progress waits for no one. Although this project is large, I believe everyone has experience."
"In short."
"Procedures and process must be planned reasonably."
"Equipment and personnel, the headquarters will assist in deployment. The project is large, and demand for materials is substantial, Langyu County allocated a piece of land in the south."
"Specifically for this project’s material transfer."
"..."
Two hours later.
Meeting ended, Mi Hao also had no choice, too many things, doing construction is just like this, be it in the early, mid, or late stages, lots of matters.
Fortunately.
Busy and tired, not afraid of delayed payments.
Otherwise,
working hard all year and not getting paid, that would be upsetting.
...
After the meeting.
Got in the car.
Came to the India-Myanmar border.
At this moment.
It was similar to when he first came, just seeing a large number of engineering vehicles lined up, those that finished work and returned previously, have to go over, it’s busy over there now.
June 1st is the construction start date.
What does it mean?
It means houses can be built, and before building houses, there is another task, which is the three connections and one leveling: connecting water, electricity, roads.
And leveling the ground.
Otherwise.
He wouldn’t be surprised that construction starts on June 1st, the three connections and one leveling can be done after obtaining the land, but building houses requires handling various permits.
Blueprint review.
Fund audit.
With dozens of truckloads of blueprints, even if the construction and other departments of this Indian state all came out, Mi Hao estimated that a month would be tough, while now it takes only a few days.
Seeing it over there, the first reaction might be: Can I give up?
After passing the checkpoint.
In some places, dust is flying, that’s where they are leveling the land. The land here is relatively flat, making it easier, as for the three connections.
Also simple.
Digging a pit.
Burying pipes.
All in one go.
For water, use Roy City’s, and electricity too, all have mature facilities, two power plants, one main and one backup, now nothing more than turning both on.
Fully capable of meeting the demand.
Moreover.
The water and electric pipelines aren’t running all over the area but circling around to supply the main construction needs for electricity and water.
Like concrete mixing.
Set it directly at the city edge, during the initial construction, the power consumption of each neighborhood is very low, mostly various machinery using oil.
Excavators.
Cranes, etc.
As for the project department, there is solar energy.
According to the large process, when they are digging pits, pipeline and other underground constructions proceed first, so that by the time there’s a large demand for electricity, there will definitely be electricity available.
Read Novel Full